The roof at the East accessibility door is being repaired.
There will be a porch roof for snow and a glass door installed.
Stencils are being done on the transepts and Sanctuary ceiling.
Stencils are being done on the frieze below the east side window. This frieze is called a “dado”.
The lights are delayed and will be worked on for the next several weeks.
Pictures of ongoing renovations are here.